Grease Trap Due
U.S. city grease trap FOG compliance guides
Commercial kitchen grease rules in the United States are enforced city by city—not by a single national calendar. A restaurant in Houston, San Antonio, or Milwaukee faces a mandatory 5-year on-site manifest retention rule, a Miami-Dade facility under a Grease Discharge Operating Permit must file electronic manifests by the 20th of the next month, a Portland kitchen submits maintenance reports to BES within 14 days, and a New York City kitchen must hire a BIC-licensed carter under 15 RCNY § 19-11. Use the interactive directory below to filter 52 major U.S. restaurant metros (publicly posted municipal pages read 2026-11-21) and jump directly to your water authority's compliance snapshot.
52 Major U.S. Restaurant Metros · Read 2026-11-21
Find your municipal pretreatment authority and manifest retention rule
Showing 52 of 52 cities
New York City
NYC DEP
15 RCNY § 19-11 25% depth cap, BIC-licensed carter proof, and DOB plan binder prep.
Open New York City FOG guide →
Los Angeles
LA Sanitation (LASAN)
LAMC § 64.30 IWMD inspections, 25% FOG limit, and 3-year on-site manifest storage.
Open Los Angeles FOG guide →
Chicago
Chicago DWM & MWRD
MCC Ch. 18-29 catch-basin rules, MWRD pretreatment limits, and 3-year O&M log books.
Open Chicago FOG guide →
Houston
Houston Health & Public Works
5-year manifest retention, full evacuation (no dewatering), and original FOG permit binder.
Open Houston FOG guide →
Dallas
Dallas Water Utilities (DWU)
Ch. 19 Art. X official City trip tickets, TCEQ + DWU hauler permits, and 3-year file.
Open Dallas FOG guide →
Austin
Austin Water
Austin Code § 15-10-165 3-year retention, 50% wetted-height trigger, and City-permitted haulers.
Open Austin FOG guide →
San Antonio
SAWS
5-year SAWS manifest retention, SAWS-permitted haulers, and annual photo inspection binder.
Open San Antonio FOG guide →
Phoenix
Phoenix Water Services
Ch. 28 indoor vs. outdoor schedules, 25% capacity limit, and 3-year on-site invoices.
Open Phoenix FOG guide →
Seattle
Seattle Public Utilities (SPU)
SPU 25% depth standard, commercial kitchen BMPs, and regional FOG provider receipts.
Open Seattle FOG guide →
San Francisco
SFPUC
SFPUC 3-year on-site signed manifests, certified hauler tracking, and wastewater inspection prep.
Open San Francisco FOG guide →
Miami-Dade County
Miami-Dade RER / DERM
GDO electronic manifest due 20th of next month, county-permitted haulers, and 3-year archive.
Open Miami-Dade County FOG guide →
Atlanta
Atlanta Watershed (DWM)
Code § 154-297.01 tiered FOG permits, GA EPD 391-3-6-.24 manifests, and multi-year audits.
Open Atlanta FOG guide →
Denver
Denver DOTI Wastewater
DRMC FOG compliance, licensed hauler volume tickets, and 3-year on-site inspection binder.
Open Denver FOG guide →
Boston
Boston BWSC
Mandatory BWSC Grease Control Log, chemical solvent ban, and 500+ gal hauler receipts.
Open Boston FOG guide →
Philadelphia
Philadelphia Water (PWD)
PWD Ch. 5 wastewater control, L&I audit binder, and 3-year signed hauler manifests.
Open Philadelphia FOG guide →
Las Vegas
Las Vegas & CCWRD
On-premises log mandate, CCWRD regional FOG rules, and Strip/valley hauler manifests.
Open Las Vegas FOG guide →
Orlando
Orlando Water Reclamation
FL three-party Service Manifests, 30-day disposal return rule, and Orlando Water audits.
Open Orlando FOG guide →
Tampa
Tampa Wastewater Dept.
Article VII City-approved hauler manifests, registered transporters, and 3-year files.
Open Tampa FOG guide →
Charlotte
Charlotte Water
3-year manifest retention, life-of-trap as-built drawings, and Charlotte Water audits.
Open Charlotte FOG guide →
Nashville
Nashville MWS
MWS 3-year immediate-access manifests, removed-gallon logs, and Metro Health prep.
Open Nashville FOG guide →
Portland
Portland BES
ENB-4.26 14-day BES reporting, Preferred Pumper option, and 3-year Title 17 archive.
Open Portland FOG guide →
San Diego
San Diego FEWD
Mandatory FEWD permit, 25% liquid depth rule, and on-site permitted hauler receipts.
Open San Diego FOG guide →
San Jose
San Jose ESD
Code § 15.14.650 SwiftComply portal, monthly indoor / quarterly outdoor baseline.
Open San Jose FOG guide →
Minneapolis
Minneapolis FOG & MCES
Dual-signed pumping manifests, T-down pipe condition notes, and 3-year MCES file.
Open Minneapolis FOG guide →
Detroit
Detroit DWSD & GLWA
DWSD/GLWA Industrial Waste Control compliance, 3–5 yr manifest binder, and audit prep.
Open Detroit FOG guide →
Columbus
Columbus Public Utilities
Director’s Rules FOG BMP, net grease/solids log, Satisfactory status, and 3-yr file.
Open Columbus FOG guide →
Indianapolis
Citizens Energy Group
Citizens Energy 25% rule, signed trip tickets beyond invoices, and 3–5 yr storage.
Open Indianapolis FOG guide →
Jacksonville
JEA Pretreatment
JEA FOG BMP online tracking, certified hauler uploads, and 3-year on-site binder.
Open Jacksonville FOG guide →
Fort Worth
Fort Worth Water
100% quarterly/25% evacuation, permitted TX haulers, and 3-year trip ticket binder.
Open Fort Worth FOG guide →
El Paso
El Paso Water (EPWater)
PSB multi-part original manifests, TCEQ + City registered haulers, and 3-year file.
Open El Paso FOG guide →
Memphis
Memphis Public Works
Memphis Code Ch. 33 FOG rules, certified haulers, and Environmental Engineering audits.
Open Memphis FOG guide →
Louisville
Louisville MSD
Requires both active log AND manifests together (3 yrs), 25% rule, MSD haulers.
Open Louisville FOG guide →
Baltimore
Baltimore City DPW
DPW 25% capacity rule, licensed hauler manifests, and 3–5 year on-site audit file.
Open Baltimore FOG guide →
Milwaukee
Milwaukee MMSD
MMSD Ch. 11 mandatory 5-year retention floor, enforcement extensions, and trip tickets.
Open Milwaukee FOG guide →
Albuquerque
Albuquerque ABCWUA
ABCWUA 3-year onsite manifest retention, pretreatment audits, and binder tracking.
Open Albuquerque FOG guide →
Tucson
Pima County RWRD
Separate log per trap/interceptor, technician name & disposal site, 3-yr RWRD file.
Open Tucson FOG guide →
Fresno
Fresno DPU Wastewater
FMC Ch. 6 Art. 3 FOG permits, truck ID receiving manifests, and 3-year DPU files.
Open Fresno FOG guide →
Sacramento
SacSewer & Sacramento
CDFA IKG brown-grease chain of custody, quarterly outdoor evacuations, 3-yr audit file.
Open Sacramento FOG guide →
Kansas City
KC Water
KCMO Code § 60-117 mandatory 3-year retention, condition checks, and KC Water audits.
Open Kansas City FOG guide →
Raleigh
Raleigh Water
Raleigh Water FOG permits, Wake County health/utility binder, and 3-year receipts.
Open Raleigh FOG guide →
New Orleans
SWBNO Pretreatment
SWBNO 25% depth cap, LA DEQ-registered haulers, and 3-year French Quarter/Orleans files.
Open New Orleans FOG guide →
Salt Lake City
Salt Lake City DPU
SLC Title 17.36 25% depth trigger, licensed UT haulers, and 3-year on-site binder.
Open Salt Lake City FOG guide →
Washington, D.C.
DC Water Pretreatment
21 DCMR Ch. 15 25% depth cap, DC Water & DC Health inspections, and 3-year files.
Open Washington, D.C. FOG guide →
Newark
Newark Water & PVSC
PVSC pretreatment rules, NJDEP-licensed haulers, 25% cap, and 3-year binder.
Open Newark FOG guide →
Pittsburgh
PWSA & ACHD
PWSA/ALCOSAN & ACHD Article XV compliance, 25% rule, and 3-year manifest file.
Open Pittsburgh FOG guide →
Cincinnati
Cincinnati MSDGC
MSDGC Article XV 25% depth rule, full evacuation, and 3-year Greater Cincinnati logs.
Open Cincinnati FOG guide →
Cleveland
Cleveland NEORSD
NEORSD Title II sewer-use rules, no chemical emulsifiers, and 3-year manifest file.
Open Cleveland FOG guide →
St. Louis
St. Louis MSD
MSD Ordinance 15714 25% capacity cap, permitted haulers, and 3-year STL files.
Open St. Louis FOG guide →
Richmond
Richmond DPU FOG
Richmond Code Ch. 28 Art. VIII 25% cap, DPU & VDH checks, and 3-year binder.
Open Richmond FOG guide →
Virginia Beach
Virginia Beach & HRSD
Hampton Roads Regional FOG (HRFOG) certified haulers, 25% rule, and 3-year logs.
Open Virginia Beach FOG guide →
Oklahoma City
OKC Utilities FOG
OKC Code Ch. 47 City-permitted haulers, 25% depth trigger, and 3-year binder.
Open Oklahoma City FOG guide →
Oakland
Oakland & EBMUD
EBMUD Title II Source Control, CA CDFA IKG licensed haulers, and 3-year audit file.
Open Oakland FOG guide →
Every city page pairs verified local agency links with a ready-to-fill pumping log workspace while respecting a clear boundary: Grease Trap Due does not perform physical grease trap cleaning, inspect underground vaults, or submit municipal e-manifests. Your permitted liquid waste hauler evacuates the trap and signs the disposal ticket; your kitchen files that grease trap manifest inside an on-site compliance binder and uses our log and reminder emails to prevent missed cycles.
If your municipality is outside these 52 metro guides—or if your restaurant group runs kitchens across multiple suburbs with different sanitary districts—the underlying binder habit is identical everywhere: confirm your local ordinance directly with your sewer authority, record every pump-out date and removed gallon count in one place, and schedule reminders far enough ahead to book a permitted vacuum truck before an inspector arrives.
Build your kitchen pumping log
Why municipal FOG rules differ across major U.S. metros
Although almost every municipal pretreatment division shares the same engineering goal—keeping animal fats, cooking oils, and food solids from choking public sewer mains—each city codifies its own inspection cadence, permit structure, and paperwork lookback window. Older combined-sewer cities such as New York, Boston, Chicago, Philadelphia, Milwaukee, and Baltimore emphasize strict prohibitions on chemical emulsifiers, food-waste grinders, and unapproved plumbing tie-ins alongside multi-year maintenance log books.
Fast-growing Sunbelt and Texas metros including Houston, Dallas, Fort Worth, Austin, San Antonio, El Paso, and Phoenix place heavy enforcement weight on numbered waste trip tickets, city-permitted special waste transporters, full 100% evacuation (prohibiting mobile dewatering), and multi-year lookback audits stretching three to five full years. Meanwhile, digital-first utilities such as Miami-Dade RER/DERM, San Jose SwiftComply, Jacksonville JEA FOG BMP, and Portland BES combine physical binder checks with recurring electronic reporting deadlines.
Because those differences sit inside local municipal codes rather than federal statutes, relying on a generic internet rule of thumb can leave a multi-unit operator exposed in the wrong jurisdiction. Comparing your city profile here before meeting a hauler or city inspector lets you verify exact terminology—whether your inspector asks for a BWSC Grease Control Log, a DWU Liquid Waste Trip Ticket, a Louisville MSD paired log and manifest, a Pima County RWRD per-device sheet, or a Miami-Dade GDO e-manifest confirmation.
Four universal records every city water inspector checks first
Across all 52 metros summarized in this directory, unannounced walkthroughs follow a remarkably consistent opening script. Inspectors start at the manager desk before lifting a single manhole cover: they ask to see proof of your active municipal FOG permit (where required), your chronological FOG maintenance log, signed waste manifests from a permitted liquid-waste transporter, and proof that service frequency keeps accumulated grease and solids below local depth thresholds.
When any one of those four pieces is missing—most commonly because a departing manager took vendor emails with them or a shift lead cannot remember which drawer holds last quarter’s receipts—inspectors treat the gap as an unverified compliance period. Writing the physical binder location directly onto your cover sheet turns an anxious ten-minute search into a calm thirty-second handoff.
Pair your city guide with our three free browser tools inside the grease trap calculators hub: verify whether your tank is properly sized with the sizing calculator, measure floating fat plus bottom sludge with the 25% FOG rule tracker, and benchmark annual hauling spend with the pumping cost estimator.
How we verify municipal sources and keep the scope honest
Each city guide in this directory was compiled by reading publicly posted municipal pretreatment and water-utility program information on 2026-11-21, citing the regulating agency, municipal code chapter, manifest retention expectation, hauler permitting authority, and official agency URL. We link straight to the public utility portal so restaurant owners can confirm fee schedules, approved hauler directories, and any recent ordinance revisions firsthand.
To prevent outdated assumptions from ever misleading a kitchen operator, our downloadable pumping log PDF never prints a hardcoded city interval. Your permit variance, seating count, frying volume, and sludge-judge depth readings determine when your next truck should arrive. You type that verified next date into our checkout or log workspace, receive your printable PDF within 5 minutes, and let our 30-day, 7-day, and 1-day email reminders protect your team from forgetting.
See how the PDF is emailed for the exact delivery timeline and 6-digit account sign-in flow, or compare single-store and five-location options on the pricing page.
Before renewing any annual commercial pumping agreement, cross-check your city guide against the actual invoice terms offered by permitted haulers in your metro. Verify whether routine quotes include full chamber evacuation, scraping interior baffles, and written disposal-site confirmation, and confirm whether your municipality requires you to keep paper trip tickets on-site or submit electronic confirmation numbers through a municipal portal each billing period. Capturing those rules once in your kitchen compliance binder eliminates repeat scramble calls before health or wastewater inspections.
Questions
01What if my restaurant city is not listed in these 52 metro guides yet?
Use the universal grease trap manifest builder directly. It records the exact four fields every U.S. pretreatment inspector reviews—date pumped, gallons or unknown, permitted hauler name, and physical binder location—plus your verified next reminder date.
02Why do Houston, San Antonio, and Milwaukee require 5 years of manifests while other cities require 3 years?
Local municipal ordinances set their own enforcement lookback windows. Houston Chapter 47, San Antonio SAWS Chapter 34, and Milwaukee MMSD Chapter 11 all enforce 5-year retention rules, whereas cities such as Dallas, Austin, Los Angeles, Phoenix, San Francisco, Denver, Columbus, Kansas City, and Philadelphia enforce a 3-year on-site retention baseline.
03Can one Grease Trap Due plan cover restaurants in multiple cities?
Yes. Our 5-location annual ($149/year) and 5-location lifetime ($999) plans on the pricing page let multi-unit operators maintain separate store labels, hauler details, and independent reminder dates across up to five kitchens in any U.S. municipality.
04Are chemical enzymes or grease-dissolving additives allowed in these cities?
Many major utilities—including NYC DEP, Chicago MWRD, Las Vegas valley sanitation, and Boston BWSC—explicitly prohibit chemical emulsifiers, solvents, or unapproved biological additives that push grease downstream into public sewers. Always confirm additive restrictions directly with your municipal pretreatment division before using any drain treatment.